APPOINTMENT OF NEW BOARD MEMBER: Swearing In and Oath of Office administered by Ben Cascio, Esq., Board Attorney Bob Lockwood, Class IV November 3, 2021 – Dec. 31, 2023
VIII. PUBLIC HEARINGS: 1. Docket #1497-21 - Jillian O’Shaughnessy 2 Babbit Bridge Dr., Block 164, Lot 49, Application for a “C” Variance for a 6’ (six) foot fence in the front yard on a corner lot where 4’ (four) foot only is permitted. Application adjourned on October 20, 2021. 2. Docket #1495-21 – Jeffrey and Angela Cohen 9 Heller Court, Block 21.05, Lot 30 Application for a “C” Variance for a 6’ (six) foot fence in the front yard on lot with two front yards where 4’ (four) foot only is permitted. 3. Docket #1484-20 - Pike Enterprises, LLC 149 Franklin Turnpike, Block 70.02, Lot 121 Preliminary and Final Site Plan Application for Conditional Use and “C” Variances to demolish the existing service station and construct a new service station with a canopy, a Dunkin Donuts with drive through, signage, and parking lot, drainage, lighting and landscaping improvements and Soil Movement Permit Application, continued from September 15, 2021. IX. ADJOURNMENT
APPOINTMENT OF NEW BOARD MEMBER: Swearing In and Oath of Office administered by Ben Cascio, Esq., Board Attorney Bob Lockwood, Class IV November 3, 2021 – Dec. 31, 2023
VIII. PUBLIC HEARINGS: 1. Docket #1497-21 - Jillian O’Shaughnessy 2 Babbit Bridge Dr., Block 164, Lot 49, Application for a “C” Variance for a 6’ (six) foot fence in the front yard on a corner lot where 4’ (four) foot only is permitted. Application adjourned on October 20, 2021. 2. Docket #1495-21 – Jeffrey and Angela Cohen 9 Heller Court, Block 21.05, Lot 30 Application for a “C” Variance for a 6’ (six) foot fence in the front yard on lot with two front yards where 4’ (four) foot only is permitted. 3. Docket #1484-20 - Pike Enterprises, LLC 149 Franklin Turnpike, Block 70.02, Lot 121 Preliminary and Final Site Plan Application for Conditional Use and “C” Variances to demolish the existing service station and construct a new service station with a canopy, a Dunkin Donuts with drive through, signage, and parking lot, drainage, lighting and landscaping improvements and Soil Movement Permit Application, continued from September 15, 2021. IX. ADJOURNMENT